top of page

About

DT Infrastructure Inc. was born out of the former IDT Foundations and offers a wealth of experience built on previous ventures.



1. *** Solar Farm Foundations *** 

Our proprietary equipment and methods have made us the undisputed leader in solar foundations installation. 

In the same soils where competing contractors struggle to install a pile in 25 to 35 minutes we have installed 100's of piles in under 5 minutes each on average. And we do this with fewer refusals than anyone else and within 1" horizontal tolerance and within 1 degree of vertical.

-Upto 121 piles/rig in a 9 hr day. 
-Regularly exceeding 100 piles/day/crew.
-Regularly installing 400 piles/day with multiple crews. 

Solar projects include :
Grand Renewable Preliminary Helical Engineering Design
Grand Renewable Production Helical Load Testing
Odessa Rock Socket Drilling
RE Orillia 2 Production Helicals
SparkleLight Production Helicals
GoodLight Remediation 
Empire Production Helicals
Empire Remediation
Empire Helical supply, fabrication.
Empire Helical pile extensions
Martin's Meadows Production Grouted Piles 
Long Lake Helical pile testing.
Long Lake Helical Pile supply and fabrication.
RE Kingston 1 Production Helical Piles
RE Kingston 2 Production Helical Piles
BeamLight Production Helical 

2. *** Deep Foundations, Underpinning, Shoring ***
Hwy 12 culvert shoring.
Pearson Airport Underpinning
Chalk River Nuclear foundations
Billy Bishop Airport foundations 
City of Cambridge pedestrian bridges
CIty of Brampton Recreation Facility foundations
University of Toronto upgrade foundations.
CIty of Toronto Community Center underpinning
Gold Crop Mining Red Lake expansion foundations
Casino Windsor earth retention system helical tiebacks.​

 

​

​

What does DT Infrastructure offer that no one else can ?

 

  1. Patent protected Swing Chuck technology for  record setting  helical pile installation production rates.

  2. Patent protected HSD Reciprocal Driver allows longer pile sections and torque/production capacity that is unequalled by any other competitor world wide.

  3. Documented project records proving unmatched productivity in adverse conditions with zero-downtime.

  4. The ability to maintain Sub-Inch precision without slowing productivity reducing costs and delays.

  5. Helical Tieback expertise and efficiency second to none.

 

 

DT Infrastructure brings Disruptive Technologies and unequalled experience  to your work site.  Your project gets completed more safely, more quickly and more reliably.

 

 

 

BETTER SOLUTIONS THROUGH INNOVATIVE THINKING

© 2023 by Hunter & Thompson. Proudly created with Wix.com

  • Facebook Basic Black
  • LinkedIn Basic Black
  • Twitter Basic Black
bottom of page